District Heating & Cooling, HVAC, Data Centers, Campus Systems

AFT in the HVAC & Facilities Industry

To a facilities engineer, it always seems like something is either too hot or too cold. Whether it be heating or cooling, water or air, a building or a district, AFT software can help you support your customers by meeting their system demands just right.

Troubleshoot

"Test Drive" operating conditions and scenarios to determine sizes, pressures, temperatures, etc... to fix or upgrade systems

Design

Accurately simulate component-system interactions prior to construction to ensure cost-effective and efficient designs

Import

Avoid redundant model building by importing GIS, PCF, EPANET, or CAESAR II Neutral files

Export

Automate data transfer with the Excel Export Manager, organizing your model's results exactly how you want them

AFT in Action

AFT Arrow Ensures Proper Fan Sizing in Nitrogen Closed Loop

AFT Arrow Ensures Proper Fan Sizing in Nitrogen Closed Loop

AFT Impulse Confirms Data Center Surge Safety After Importing 1000+ Pipe HVAC Systems

AFT Impulse Confirms Data Center Surge Safety After Importing 1000+ Pipe HVAC Systems

AFT Fathom Reveals Faulty Equipment in Hot Oil Network Energy Optimization Study

AFT Fathom Reveals Faulty Equipment in Hot Oil Network Energy Optimization Study

AFT Fathom Used to Minimize Pumping Cost for Cooling Water System

AFT Fathom Used to Minimize Pumping Cost for Cooling Water System

AFT Fathom Used to Determine Size and Cost of Condenser Water Distribution Pipes

AFT Fathom Used to Determine Size and Cost of Condenser Water Distribution Pipes

AFT Fathom Instrumental in Reconfiguring Office Building HVAC System

AFT Fathom Instrumental in Reconfiguring Office Building HVAC System

University of Alabama Reduces Energy Usage – Saves $60,000 a Year

University of Alabama Reduces Energy Usage – Saves $60,000 a Year

Data Center Air Cooling System Conversion Project Validated Using AFT Fathom

Data Center Air Cooling System Conversion Project Validated Using AFT Fathom

AFT Fathom Determines Cause of Failures: Emergency Cooling Water Ride-through System

AFT Fathom Determines Cause of Failures: Emergency Cooling Water Ride-through System

Campus Steam System Redesign Moves Forward After Data Matches AFT Arrow Model

Campus Steam System Redesign Moves Forward After Data Matches AFT Arrow Model

District Heating System Modernized Using AFT Fathom

District Heating System Modernized Using AFT Fathom

Hydraulic Analysis: Dry Fire Line Piping Network for Twin Tunnel Subway Design Project Using AFT Fathom

Hydraulic Analysis: Dry Fire Line Piping Network for Twin Tunnel Subway Design Project Using AFT Fathom

AFT Fathom Instrumental in District Cooling System Planning, Development & Operation

AFT Fathom Instrumental in District Cooling System Planning, Development & Operation

Campus Chill Water System Improved Through Hydraulic Modeling with AFT Fathom

Campus Chill Water System Improved Through Hydraulic Modeling with AFT Fathom

Let's Get Started!

Want to learn more about AFT software and see if it's the right solution for you?